New Long Beach port bridge opens soon

The port of Long Beach will open its eagerly awaited new bridge on Oct. 5 after seven years of construction. The long wait was due in part to COVID-19 restrictions and was also intentionally delayed for careful attention to earthquake safety. The bridge currently has no name, but will be replacing the Gerald Desmond Bridge.

This new bridge will have three lanes in each direction across its two mile length to reduce traffic congestion. It will have connections to the 710 Freeway, Terminal Island, and Downtown Long Beach. In addition, larger container ships will be able to pass under the bridge, as it is taller than the Gerald Desmond Bridge.

Photo by kyler trautner on Unsplash

More: https://www.lbbusinessjournal.com/bridge-to-everywhere-set-to-open-for-vehicle-traffic-oct-5/